The painters are all done and I'm pretty happy overall with the paint job... There's a few touches that need to be done up but I'm sure once all the other trades have come through theyll get back to it.
All the timber work has been stained and looking fabulous. I think the pantry doors a still a bit unfinished
The plumbers have installed all the tapware, toilets and hot water systems.
Electrical fit off is nearly complete - Most lights have been installed, air conditioning done
Carpenter still needs drill all the fittings/fixtures and door handles.
I'll hopefully be able to spend some time checking all the paint work and identifying issues that need fixing before handover
 |
We have light! Amazing Value LED lighting |
 |
Niche for Water and power |
 |
waiting on our island pendants, they sent the wrong ones |
 |
Garage door installed, facade complete |
 |
55cm Peeta Pendant, needs to be adjusted slightly lower |
 |
Hills Security Installed |
 |
Master bedroom |
 |
Paintwork complete |
 |
Black Glass Gas Cooktop |
 |
Daikin Multizone Unit |
 |
Ducted airconditioning - massive unit |
 |
Ensuite |
 |
Bathtub |