Monday 27 July 2015

Week 24 - Fit off (Electrical / Plumbing)

The painters are all done and I'm pretty happy overall with the paint job... There's a few touches that need to be done up but I'm sure once all the other trades have come through theyll get back to it.

All the timber work has been stained and looking fabulous. I think the pantry doors a still a bit unfinished

The plumbers have installed all the tapware, toilets and hot water systems.

Electrical fit off is nearly complete - Most lights have been installed, air conditioning done

Carpenter still needs drill all the fittings/fixtures and door handles.

I'll hopefully be able to spend some time checking all the paint work and identifying issues that need fixing before handover




We have light! Amazing Value LED lighting


Niche for Water and power

waiting on our island pendants, they sent the wrong ones

Garage door installed, facade complete

55cm Peeta Pendant, needs to be adjusted slightly lower




Hills Security Installed

Master bedroom


Paintwork complete

Black Glass Gas Cooktop
Daikin Multizone Unit

Ducted airconditioning - massive unit





Ensuite
Bathtub